Improvements to the eastern portion of Runway 10C-28C and Runway 10L-28R included installation of a drainage system; installation of CECO and a common electrical duct bank; 400,000平方码的18英寸和21英寸波特兰水泥混凝土跑道路面, taxiway and apron surfaces; and asphalt paving for the runway, 滑行道和停机坪. 该项目还包括安装机场照明基础设施, 围栏的安装包括防爆围栏, 还有标记和条纹.